Seamless Steel Pipe Production Process

Released on Sep. 24 , 2019

On our website you can find reliable P11 Seamless Steel Pipe Suppliers, please feel free to ask us any questions and questions.


The biggest advantage of P11 Seamless Steel Pipe is that it can be 100% recycled, in line with the national strategy of environmental protection, energy saving and resource conservation. The national policy encourages the expansion of the application field of high pressure p11 seamless steel pipe. At present, the proportion of p11 seamless steel pipe consumption in China accounts for only half of the total amount of steel, and the use of p11 seamless steel pipe expands to provide a broader space for the development of the industry. According to the research of the p11 seamless steel pipe branch of China Special Steel Association, the demand for high-pressure p11 seamless steel pipe in China will increase by 10-12% annually.


P11 Seamless Steel Pipe

P11 Seamless Steel Pipe


A seamless steel pipe made of a single piece of metal with no seams on the surface is called a seamless steel pipe. According to the production method, the seamless pipe is divided into a hot rolled pipe, a cold rolled pipe, a cold drawn pipe, an extruded pipe, a top pipe, and the like. According to the shape of the section, the seamless steel tube is divided into two types: a circular shape and a special shape. The shaped tube has a plurality of complicated shapes such as a square shape, an elliptical shape, a triangular shape, a hexagonal shape, a melon shape, a star shape, and a winged tube. The maximum diameter is 650mm and the minimum diameter is 0.3mm. Depending on the application, there are thick-walled tubes and thin-walled tubes. Seamless steel pipes are mainly used for petroleum geological drilling pipes, cracking pipes for petrochemicals, boiler tubes, bearing tubes, and high-precision structural steel tubes for automobiles, tractors, and aviation.


Seamless steel tubes have hollow sections and are used in large quantities as pipes for transporting fluids, such as pipes for transporting petroleum, natural gas, gas, water and certain solid materials. Compared with solid steel such as round steel, the steel pipe has a lighter weight when it has the same bending and torsional strength, and is an economical section steel. Widely used in the manufacture of structural parts and mechanical parts, such as oil drill pipes, automotive drive shafts, bicycle frames and steel scaffolding used in construction, etc. The use of steel pipes to manufacture ring parts can improve material utilization, simplify manufacturing processes, save materials and processing. Working hours.


The production process of general seamless steel pipe can be divided into cold drawing and hot rolling. The production process of cold rolled seamless steel pipe is generally more complicated than hot rolling. The pipe blank must first be rolled in three rolls. Sizing test, if the surface does not respond to the crack, the round tube is cut by a cutter and cut into a blank of about one meter in length. Then enter the annealing process, the acidification should be acid-washed with acid liquid. When pickling, pay attention to whether there is a large amount of foaming on the surface. If there is a large amount of foaming, the quality of the steel pipe will not reach the corresponding standard. The appearance of cold-rolled seamless steel pipe is shorter than that of hot-rolled seamless steel pipe. The wall thickness of cold-rolled seamless steel pipe is generally smaller than that of hot-rolled seamless steel pipe, but the surface looks brighter than thick-walled seamless steel pipe, and the surface is not too It's rough and there aren't too many burrs in the caliber.


The delivery status of the hot-rolled seamless steel pipe is generally delivered after the heat treatment in the hot rolled state. After the quality inspection, the hot-rolled seamless steel pipe is subjected to strict manual selection by the staff. After the quality inspection, the surface is oiled, followed by multiple cold drawing experiments, and the perforation experiment is performed after the hot rolling treatment. If the perforation is too large, straightening correction is required. After straightening, the conveyor is sent to the flaw detector for flaw detection experiments, and finally labeled, formatted, and placed in the warehouse.


If you are looking for more information about the products, please feel free to contact us, they are a professional P11 Seamless Steel Pipe Factory.


*
*
*
*
*

Copyright © Hebei Senhai Pipeline Co., Ltd. All Rights Reserved | Sitemap | Powered by   

HOME TEL INQUIRY